Drinking Water Transmission and Network Lines Construction Work in Turkler, Kargicak, Konaklı, Kestel Neighborhoods of Alanya District

Türkiye

Ülke

Alanya/ANTALYA

Şehir

18/10/2021

Başlangıç Tarihi

31/12/2023

Bitiş Tarihi

Drinking Water Transmission and Network Lines Construction Work in Turkler, Kargicak, Konaklı, Kestel Neighborhoods of Alanya District
Drinking Water Transmission and Network Lines Construction Work in Turkler, Kargicak, Konaklı, Kestel Neighborhoods of Alanya District
Drinking Water Transmission and Network Lines Construction Work in Turkler, Kargicak, Konaklı, Kestel Neighborhoods of Alanya District
Drinking Water Transmission and Network Lines Construction Work in Turkler, Kargicak, Konaklı, Kestel Neighborhoods of Alanya District
Drinking Water Transmission and Network Lines Construction Work in Turkler, Kargicak, Konaklı, Kestel Neighborhoods of Alanya District
KURUM: ANTALYA WATER AND WASTEWATER ADMINISTRATION GENERAL DIRECTORATE (ASAT)

It includes 75,284 m HDPE pipes for drinking water lines, 4,241 m ductile pipes, 235 subscriber connections and the engineering structures covering these productions.