Ülke
Şehir
Başlangıç Tarihi
Bitiş Tarihi
Laying of L=23.200 m network main pipe, transmission and discharge line with PE-100 PN 10 and ductile (C40) pipes in the diameter range of Ø125-250 mm, 1 ea. V=800m³ warehouse, existing catchment area improvement works, engineering works and mechanical and electrical works.