Ülke
Şehir
Başlangıç Tarihi
Bitiş Tarihi
8,765 drinking water line failures, 43,280 meters of drinking water subscriber line manufacturing, 38,900 m of drinking water line manufacturing, 1,625 sewer line failures, 16,350 meters of sewerage subscriber line manufacturing, 37,770 m of sewer line manufacturing, 60,000 m³ of sewage pumping and other maintenance and repair works.